Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems
Mining, Metallurgy & Exploration · 2024-08 · 41 (4) · 1677-1691
DOI: 10.1007/s42461-024-01005-2 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mining, Metallurgy & Exploration, online erschienen am 27.06.2024. Verfasst von Liam Findlay und 1 weiteren Autor:innen. Die Arbeit wurde bisher 9-mal zitiert (Crossref) und nennt 60 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Semi-mobile in-pit crushing and conveying (IPCC) systems can help reduce truck haulage in open-pit mines by bringing the crusher closer to the excavation areas. Optimizing a production schedule with semi-mobile IPCC requires integrating extraction sequence, destination policy, crusher relocation, conveyor layout, and truck fleet investment decisions. A mining complex with multiple mines and IPCC systems should be optimized simultaneously to find an optimal schedule for the entire value chain. An integrated stochastic optimization framework is proposed to produce long-term production schedules for mining complexes using multiple semi-mobile IPCC systems. The optimization model has flexibility to select the crusher locations and conveyor routes from anywhere inside the pits. The framework uses simulated orebody realizations to consider multi-element grade uncertainty and manage associated risk. A hybrid metaheuristic solution approach based on simulated annealing and evolutionary algorithms is implemented. The method is demonstrated using an iron ore mining complex.
Zitieren
APA
Findlay, L., & Dimitrakopoulos, R. (2024). Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems. Mining, Metallurgy & Exploration, 41(4), 1677-1691. https://doi.org/10.1007/s42461-024-01005-2
Vancouver
Findlay L, Dimitrakopoulos R. Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems. Mining, Metallurgy & Exploration. 2024;41(4):1677-1691. doi:10.1007/s42461-024-01005-2
BibTeX
@article{Findlay2024,
author = {Findlay, Liam and Dimitrakopoulos, Roussos},
title = {Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems},
journal = {Mining, Metallurgy & Exploration},
year = {2024},
volume = {41},
number = {4},
pages = {1677--1691},
doi = {10.1007/s42461-024-01005-2}
}
EUVIMED