CEPC Technical Design Report: Accelerator

Jie Gao

Radiation Detection Technology and Methods · 2024-03 · 8 (1) · 1-1105

DOI: 10.1007/s41605-024-00463-y ↗

Kurz gefasst

Fachartikel in der Zeitschrift Radiation Detection Technology and Methods, online erschienen am 03.06.2024. Verfasst von Jie Gao. Die Arbeit wurde bisher 148-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s.

Zitieren

APA

Gao, J. (2024). CEPC Technical Design Report: Accelerator. Radiation Detection Technology and Methods, 8(1), 1-1105. https://doi.org/10.1007/s41605-024-00463-y

Vancouver

Gao J. CEPC Technical Design Report: Accelerator. Radiation Detection Technology and Methods. 2024;8(1):1-1105. doi:10.1007/s41605-024-00463-y

BibTeX
@article{Gao2024,
  author = {Gao, Jie},
  title = {CEPC Technical Design Report: Accelerator},
  journal = {Radiation Detection Technology and Methods},
  year = {2024},
  volume = {8},
  number = {1},
  pages = {1--1105},
  doi = {10.1007/s41605-024-00463-y}
}
Kostenlos starten →