EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden

Cun Zhang, Juhao Cheng, Jun He, Yongqi Lian, Qingsheng Bai, Zhiwen Da, Yi Wang

International Journal of Coal Science & Technology · 2026-12 · 13 (1)

DOI: 10.1007/s40789-025-00852-8 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Coal Science & Technology, online erschienen am 10.04.2026. Verfasst von Cun Zhang und 6 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 61 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, China Postdoctoral Science Foundation, Fundamental Research Funds for the Central Universities.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study investigates the height evolution of the water-conducting fracture zone (WCFZ) under super-high mining conditions in the 1101 longwall face of Zhundong No. 2 Mine. Based on 28 measured datasets, a multivariate nonlinear regression model is proposed, outperforming traditional empirical formulas in accuracy. Numerical simulations reveal four developmental stages of the WCFZ: initial acceleration (0–180 m), deceleration (180–270 m), renewed acceleration (270–420 m), and stabilization (≥ 420 m). Morphologically, the WCFZ transforms from arch-shaped to trapezoidal and ultimately to a flattened arch. Three-dimensional simulations show synchronized evolution between the plastic zone and the WCFZ. Field validation is achieved through microseismic monitoring and borehole leakage data. A critical mining height of 16 m is identified, beyond which WCFZ growth shifts from linear (11.38 m/unit) to nonlinear (19.45 m/unit), causing destabilization of the beam-arch structure and promoting vertical fractures. Fracture patterns vary by lithology: weakly consolidated strata form mesh-like networks, while cemented layers exhibit stepwise, slip-induced fractures. This study offers an accurate prediction model and insights into WCFZ mechanics for improved mining safety and groundwater protection.

Förderung

  • National Natural Science Foundation of China
  • China Postdoctoral Science Foundation
  • Fundamental Research Funds for the Central Universities

Zitieren

APA

Zhang, C., Cheng, J., He, J., Lian, Y., Bai, Q., Da, Z., & Wang, Y. (2026). Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden. International Journal of Coal Science & Technology, 13(1). https://doi.org/10.1007/s40789-025-00852-8

Vancouver

Zhang C, Cheng J, He J, Lian Y, Bai Q, Da Z, et al. Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden. International Journal of Coal Science & Technology. 2026;13(1). doi:10.1007/s40789-025-00852-8

BibTeX
@article{Zhang2026,
  author = {Zhang, Cun and Cheng, Juhao and He, Jun and Lian, Yongqi and Bai, Qingsheng and Da, Zhiwen and Wang, Yi},
  title = {Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden},
  journal = {International Journal of Coal Science & Technology},
  year = {2026},
  volume = {13},
  number = {1},
  doi = {10.1007/s40789-025-00852-8}
}
Kostenlos starten →