Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden
International Journal of Coal Science & Technology · 2026-12 · 13 (1)
DOI: 10.1007/s40789-025-00852-8 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Coal Science & Technology, online erschienen am 10.04.2026. Verfasst von Cun Zhang und 6 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 61 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, China Postdoctoral Science Foundation, Fundamental Research Funds for the Central Universities.
Abstract (Originalsprache)
This study investigates the height evolution of the water-conducting fracture zone (WCFZ) under super-high mining conditions in the 1101 longwall face of Zhundong No. 2 Mine. Based on 28 measured datasets, a multivariate nonlinear regression model is proposed, outperforming traditional empirical formulas in accuracy. Numerical simulations reveal four developmental stages of the WCFZ: initial acceleration (0–180 m), deceleration (180–270 m), renewed acceleration (270–420 m), and stabilization (≥ 420 m). Morphologically, the WCFZ transforms from arch-shaped to trapezoidal and ultimately to a flattened arch. Three-dimensional simulations show synchronized evolution between the plastic zone and the WCFZ. Field validation is achieved through microseismic monitoring and borehole leakage data. A critical mining height of 16 m is identified, beyond which WCFZ growth shifts from linear (11.38 m/unit) to nonlinear (19.45 m/unit), causing destabilization of the beam-arch structure and promoting vertical fractures. Fracture patterns vary by lithology: weakly consolidated strata form mesh-like networks, while cemented layers exhibit stepwise, slip-induced fractures. This study offers an accurate prediction model and insights into WCFZ mechanics for improved mining safety and groundwater protection.
Förderung
- National Natural Science Foundation of China
- China Postdoctoral Science Foundation
- Fundamental Research Funds for the Central Universities
Zitieren
APA
Zhang, C., Cheng, J., He, J., Lian, Y., Bai, Q., Da, Z., & Wang, Y. (2026). Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden. International Journal of Coal Science & Technology, 13(1). https://doi.org/10.1007/s40789-025-00852-8
Vancouver
Zhang C, Cheng J, He J, Lian Y, Bai Q, Da Z, et al. Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden. International Journal of Coal Science & Technology. 2026;13(1). doi:10.1007/s40789-025-00852-8
BibTeX
@article{Zhang2026,
author = {Zhang, Cun and Cheng, Juhao and He, Jun and Lian, Yongqi and Bai, Qingsheng and Da, Zhiwen and Wang, Yi},
title = {Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden},
journal = {International Journal of Coal Science & Technology},
year = {2026},
volume = {13},
number = {1},
doi = {10.1007/s40789-025-00852-8}
}
EUVIMED