EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

The interplay and incremental development of tidal stream arrays in the Pentland Firth

Misha D Patel, Amanda S M Smyth, Athanasios Angeloudis, Thomas A A Adcock

Journal of Ocean Engineering and Marine Energy · 2026-08 · 12 (3) · 1325-1350

DOI: 10.1007/s40722-026-00490-5 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Ocean Engineering and Marine Energy, online erschienen am 15.04.2026. Verfasst von Misha D Patel und 3 weiteren Autor:innen. Beteiligte Einrichtung: Department of Engineering Science, University of Oxford, Parks Road, Oxford, OX13PJ UK. Die Arbeit nennt 75 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Engineering and Physical Sciences Research Council.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The development of tidal stream energy sites is constrained by numerous practical, technical, and accessible constraints, including changes in the flow caused by the presence of the tidal farm. Large and complex sites are typically developed incrementally and may involve multiple developers. This regional modelling case study of the Pentland Firth, widely regarded as one of the most significant global locations for tidal energy extraction, investigates these dynamics. This study examines scenarios for the incremental development of the Pentland Firth, incorporating assumptions regarding tidal farm design. The analysis considers a range of configurations, including variations in turbine density and the incorporation of shipping lanes within designated lease areas. The study finds that there are interactions between individually developed tidal farms of the site, but they are moderate with the power in a given farm unlikely to vary by more than 20% (based on a positive interaction), as a result of the development of other farms in other parts of the Pentland Firth. To minimise such array interactions, it is recommended that site leasing be based on the allowable thrust applied to the flow rather than on projected power generation. Furthermore, the findings suggest that the maximum power generated from turbines in the Pentland Firth, averaged over time, is unlikely to exceed approximately 1 GW, broadly consistent with most estimates in the literature.

Schlagwörter

Stichwörter der Autor:innen

Incremental developmentPentland FirthRegional modellingTidal array interactionsTidal stream energyTidal turbine arrays

Autor:innen und Institutionen

  • Department of Engineering Science, University of Oxford, Parks Road, Oxford, OX13PJ UK.
  • School of Engineering, University of Edinburgh, West Mains Road, Edinburgh, EH93JG UK.

Förderung

  • Engineering and Physical Sciences Research Council

Zitieren

APA

Patel, M. D., Smyth, A. S. M., Angeloudis, A., & Adcock, T. A. A. (2026). The interplay and incremental development of tidal stream arrays in the Pentland Firth. Journal of Ocean Engineering and Marine Energy, 12(3), 1325-1350. https://doi.org/10.1007/s40722-026-00490-5

Vancouver

Patel MD, Smyth ASM, Angeloudis A, Adcock TAA. The interplay and incremental development of tidal stream arrays in the Pentland Firth. Journal of Ocean Engineering and Marine Energy. 2026;12(3):1325-1350. doi:10.1007/s40722-026-00490-5

BibTeX
@article{Patel2026,
  author = {Patel, Misha D and Smyth, Amanda S M and Angeloudis, Athanasios and Adcock, Thomas A A},
  title = {The interplay and incremental development of tidal stream arrays in the Pentland Firth},
  journal = {Journal of Ocean Engineering and Marine Energy},
  year = {2026},
  volume = {12},
  number = {3},
  pages = {1325--1350},
  doi = {10.1007/s40722-026-00490-5}
}
Kostenlos starten →