EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Generalized Accelerated Failure Time Model to Predict Restoration Time from Power Outages

Tasnuba Binte Jamal, Samiul Hasan

International Journal of Disaster Risk Science · 2023-12 · 14 (6) · 995-1010

DOI: 10.1007/s13753-023-00529-3 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Disaster Risk Science, online erschienen am 08.01.2024. Verfasst von Tasnuba Binte Jamal und 1 weiteren Autor:innen. Die Arbeit wurde bisher 12-mal zitiert (Crossref) und nennt 62 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Major disasters such as wildfire, tornado, hurricane, tropical storm, and flooding cause disruptions in infrastructure systems such as power and water supply, wastewater management, telecommunication, and transportation facilities. Disruptions in electricity infrastructure have negative impacts on sectors throughout a region, including education, medical services, financial services, and recreation. In this study, we introduced a novel approach to investigate the factors that can be associated with longer restoration time of power service after a hurricane. Considering restoration time as the dependent variable and using a comprehensive set of county-level data, we estimated a generalized accelerated failure time (GAFT) model that accounts for spatial dependence among observations for time to event data. The model fit improved by 12% after considering the effects of spatial correlation in time to event data. Using the GAFT model and Hurricane Irma’s impact on Florida as a case study, we examined: (1) differences in electric power outages and restoration rates among different types of power companies—investor-owned power companies, rural and municipal cooperatives; (2) the relationship between the duration of power outage and power system variables; and (3) the relationship between the duration of power outage and socioeconomic attributes. The findings of this study indicate that counties with a higher percentage of customers served by investor-owned electric companies and lower median household income faced power outage for a longer time. This study identified the key factors to predict restoration time of hurricane-induced power outages, allowing disaster management agencies to adopt strategies required for restoration process.

Zitieren

APA

Jamal, T. B., & Hasan, S. (2023). A Generalized Accelerated Failure Time Model to Predict Restoration Time from Power Outages. International Journal of Disaster Risk Science, 14(6), 995-1010. https://doi.org/10.1007/s13753-023-00529-3

Vancouver

Jamal TB, Hasan S. A Generalized Accelerated Failure Time Model to Predict Restoration Time from Power Outages. International Journal of Disaster Risk Science. 2023;14(6):995-1010. doi:10.1007/s13753-023-00529-3

BibTeX
@article{Jamal2023,
  author = {Jamal, Tasnuba Binte and Hasan, Samiul},
  title = {A Generalized Accelerated Failure Time Model to Predict Restoration Time from Power Outages},
  journal = {International Journal of Disaster Risk Science},
  year = {2023},
  volume = {14},
  number = {6},
  pages = {995--1010},
  doi = {10.1007/s13753-023-00529-3}
}
Kostenlos starten →