Crossref
Green unrelated parallel machine scheduling problem under availability and energy constraints: a bi-objective approach
Optimization and Engineering · 01.04.2026
DOI: 10.1007/s11081-026-10084-7 ↗Kurz gefasst
Fachartikel in der Zeitschrift Optimization and Engineering, online erschienen am 01.04.2026. Verfasst von Meriem Touat und 3 weiteren Autor:innen. Die Arbeit nennt 58 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Touat, M., Benatchba, K., Aghelinejad, M., & Meguellati, L. (2026). Green unrelated parallel machine scheduling problem under availability and energy constraints: a bi-objective approach. Optimization and Engineering. https://doi.org/10.1007/s11081-026-10084-7
Vancouver
Touat M, Benatchba K, Aghelinejad M, Meguellati L. Green unrelated parallel machine scheduling problem under availability and energy constraints: a bi-objective approach. Optimization and Engineering. 2026. doi:10.1007/s11081-026-10084-7
BibTeX
@article{Touat2026,
author = {Touat, Meriem and Benatchba, Karima and Aghelinejad, MohammadMohsen and Meguellati, Lyna-Razane},
title = {Green unrelated parallel machine scheduling problem under availability and energy constraints: a bi-objective approach},
journal = {Optimization and Engineering},
year = {2026},
doi = {10.1007/s11081-026-10084-7}
}
EUVIMED