Crossref
Upgrading layout and design solutions in the course of design and construction of the Chirkeiskaya hydroelectric plant
Power Technology and Engineering · 2004
DOI: 10.1007/s10749-005-0004-2 ↗Kurz gefasst
Fachartikel in der Zeitschrift Power Technology and Engineering, 2004. Verfasst von A. A. Neikovskii und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Neikovskii, A. A., Kasatkin, N. V., & Minin, V. A. (2004). Upgrading layout and design solutions in the course of design and construction of the Chirkeiskaya hydroelectric plant. Power Technology and Engineering. https://doi.org/10.1007/s10749-005-0004-2
Vancouver
Neikovskii AA, Kasatkin NV, Minin VA. Upgrading layout and design solutions in the course of design and construction of the Chirkeiskaya hydroelectric plant. Power Technology and Engineering. 2004. doi:10.1007/s10749-005-0004-2
BibTeX
@article{Neikovskii2004,
author = {Neikovskii, A. A. and Kasatkin, N. V. and Minin, V. A.},
title = {Upgrading layout and design solutions in the course of design and construction of the Chirkeiskaya hydroelectric plant},
journal = {Power Technology and Engineering},
year = {2004},
doi = {10.1007/s10749-005-0004-2}
}
EUVIMED