Ground Response to Phased Excavations Using Pipe-Jacking and Horizontal Directional Drilling: A Case Study Beneath Beijing’s G105 Highway

Providence Habumuremyi, Hao Guo, Penghao Jiang, Mengyan Kong, Jiayue Chen, Ming Huang, Yunxiang Zhou

Geotechnical and Geological Engineering · 2025-12 · 43 (9)

DOI: 10.1007/s10706-025-03476-6 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Geotechnical and Geological Engineering, online erschienen am 31.10.2025. Verfasst von Providence Habumuremyi und 6 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 51 Literaturangaben. Gefördert von: National Youth Top-notch Talent Support Program of China, Innovative Research Group Project of the National Natural Science Foundation of China, Ten Thousand Talent Plans for Young Top-notch Talents of Yunnan Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Förderung

  • National Youth Top-notch Talent Support Program of China
  • Innovative Research Group Project of the National Natural Science Foundation of China
  • Ten Thousand Talent Plans for Young Top-notch Talents of Yunnan Province

Zitieren

APA

Habumuremyi, P., Guo, H., Jiang, P., Kong, M., Chen, J., Huang, M., & Zhou, Y. (2025). Ground Response to Phased Excavations Using Pipe-Jacking and Horizontal Directional Drilling: A Case Study Beneath Beijing’s G105 Highway. Geotechnical and Geological Engineering, 43(9). https://doi.org/10.1007/s10706-025-03476-6

Vancouver

Habumuremyi P, Guo H, Jiang P, Kong M, Chen J, Huang M, et al. Ground Response to Phased Excavations Using Pipe-Jacking and Horizontal Directional Drilling: A Case Study Beneath Beijing’s G105 Highway. Geotechnical and Geological Engineering. 2025;43(9). doi:10.1007/s10706-025-03476-6

BibTeX
@article{Habumuremyi2025,
  author = {Habumuremyi, Providence and Guo, Hao and Jiang, Penghao and Kong, Mengyan and Chen, Jiayue and Huang, Ming and Zhou, Yunxiang},
  title = {Ground Response to Phased Excavations Using Pipe-Jacking and Horizontal Directional Drilling: A Case Study Beneath Beijing’s G105 Highway},
  journal = {Geotechnical and Geological Engineering},
  year = {2025},
  volume = {43},
  number = {9},
  doi = {10.1007/s10706-025-03476-6}
}
Kostenlos starten →