EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Statistical post-processing of daily ensembles enhances the one-month forecast skill of SEAS5 global precipitation

Zeqing Huang, Hanjie Shen, Eun-Soon Im, Hyun-Han Kwon

Stochastic Environmental Research and Risk Assessment · 2026-10 · 40 (10)

DOI: 10.1007/s00477-026-03381-1 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Stochastic Environmental Research and Risk Assessment, online erschienen am 04.10.2026. Verfasst von Zeqing Huang und 3 weiteren Autor:innen. Die Arbeit nennt 79 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea Environmental Industry & Technology Institute through Water Management Program for Drought Project.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Subseasonal-to-seasonal precipitation forecasts are highly relevant for a wide range of practical applications and risk management, but their skill decreases substantially at longer lead times. Although statistical post-processing is widely regarded as a key step for improving forecast reliability, the skill of post-processed daily precipitation forecasts up to one month remains poorly quantified at a global scale. Here, we evaluate global daily precipitation forecasts for July from 1981 to 2024 generated by the Seasonal Forecasting System version 5 (SEAS5) of the European Centre for Medium-Range Weather Forecasts (ECMWF). The Bernoulli-Gamma-Gaussian (BGG) model calibrates daily ensemble spreads, and the Schaake Shuffle links ensemble members to construct daily trajectories. The performance of BGG-based post-processing is benchmarked against quantile mapping (QM) under rigorous leave-one-year-out cross-validation. Raw SEAS5 forecasts of daily precipitation often exhibit negative skill and underperform climatological forecasts owing to systematic biases and the decay of skill with lead times. These daily biases further compound over lead time, severely eroding the skill of accumulated totals. Statistical post-processing effectively corrects systematic biases, aligns ensemble forecasts with observed distributions, and prevents the accumulation of forecast errors. Relative to QM, the BGG further improves forecast skill by enhancing the reliability of ensemble spreads. The post-processing typically extends the lead time of positive skill to about 7 days for daily amounts and beyond 20 days for accumulated totals, with regional variations and seasonal dependence. Overall, this global evaluation provides practical guidance for post-processing daily precipitation forecasts and serves as a valuable reference for their use in water and agricultural management.

Förderung

  • Korea Environmental Industry & Technology Institute through Water Management Program for Drought Project

Zitieren

APA

Huang, Z., Shen, H., Im, E., & Kwon, H. (2026). Statistical post-processing of daily ensembles enhances the one-month forecast skill of SEAS5 global precipitation. Stochastic Environmental Research and Risk Assessment, 40(10). https://doi.org/10.1007/s00477-026-03381-1

Vancouver

Huang Z, Shen H, Im E, Kwon H. Statistical post-processing of daily ensembles enhances the one-month forecast skill of SEAS5 global precipitation. Stochastic Environmental Research and Risk Assessment. 2026;40(10). doi:10.1007/s00477-026-03381-1

BibTeX
@article{Huang2026,
  author = {Huang, Zeqing and Shen, Hanjie and Im, Eun-Soon and Kwon, Hyun-Han},
  title = {Statistical post-processing of daily ensembles enhances the one-month forecast skill of SEAS5 global precipitation},
  journal = {Stochastic Environmental Research and Risk Assessment},
  year = {2026},
  volume = {40},
  number = {10},
  doi = {10.1007/s00477-026-03381-1}
}
Kostenlos starten →