Optimising radiology workflow in a high-volume academic medical centre: a multi-phase, data-driven quality improvement initiative
Abdominal Radiology · 29.06.2026
DOI: 10.1007/s00261-026-05607-w ↗Kurz gefasst
Fachartikel in der Zeitschrift Abdominal Radiology, online erschienen am 29.06.2026. Verfasst von Divyansh Gupta und 3 weiteren Autor:innen. Beteiligte Einrichtung: Department of Radiodiagnosis, Sawai ManSingh Medical College and Hospital, Jaipur, India. drdivyanshrad@gmail.com. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 19 Literaturangaben.
Abstract (Originalsprache)
PURPOSE: High-volume public radiology departments face multifactorial workflow challenges driven by fragmented digital infrastructure and high imaging demand under state-sponsored health coverage programmes. We aimed to evaluate a multi-phase quality improvement initiative targeting pre-scan, scan and post-scan bottlenecks in CT and MRI services at a publicly funded, PPP-operated tertiary academic centre. METHODS: A pre-post study using the Plan-Do-Study-Act framework was conducted per SQUIRE 2.0. A multidisciplinary team implemented 13 targeted interventions across three workflow phases. Outcomes were compared by independent-samples t-tests, Wilcoxon rank-sum tests, and chi-square or Fisher exact tests; process stability was assessed with Shewhart X-bar control charts (α = 0.05). RESULTS: CT registration-to-scan time decreased from 2.1 to 1.2 h (-43%) and MRI waiting time from 10.2 to 4.8 h (-53%), both p < 0.001. Manual registration delay fell from 17 to 6 min per examination (-65%, p < 0.001). Reporting backlog dropped from 26 to 9 h and critical-result turnaround from 90 to 40 min (both p < 0.001). Protocol omission decreased from 15.4% to 5.2% (p < 0.001). Median staff burnout decreased from 7.0 to 4.0 and patient satisfaction rose from 58% to 82% (both p < 0.001). Study-unit throughput increased 20.2% (p < 0.001). Improvements were stable across the post-intervention window. CONCLUSION: A structured, low-cost, multi-phase QI initiative demonstrated statistically significant improvements in workflow efficiency, diagnostic completeness, staff well-being and patient experience without capital equipment investment, with process stability demonstrated over the short-term observation window. The framework is replicable in resource-constrained academic radiology departments with similar PPP arrangements.
Schlagwörter
Stichwörter der Autor:innen
Autor:innen und Institutionen
- Department of Radiodiagnosis, Sawai ManSingh Medical College and Hospital, Jaipur, India. drdivyanshrad@gmail.com.
- Department of Radiodiagnosis, Sawai ManSingh Medical College and Hospital, Jaipur, India.
Zitieren
APA
Gupta, D., Gupta, P., Gupta, N., & Bhandari, A. (2026). Optimising radiology workflow in a high-volume academic medical centre: a multi-phase, data-driven quality improvement initiative. Abdominal Radiology. https://doi.org/10.1007/s00261-026-05607-w
Vancouver
Gupta D, Gupta P, Gupta N, Bhandari A. Optimising radiology workflow in a high-volume academic medical centre: a multi-phase, data-driven quality improvement initiative. Abdominal Radiology. 2026. doi:10.1007/s00261-026-05607-w
BibTeX
@article{Gupta2026,
author = {Gupta, Divyansh and Gupta, Parul and Gupta, Naman and Bhandari, Anu},
title = {Optimising radiology workflow in a high-volume academic medical centre: a multi-phase, data-driven quality improvement initiative},
journal = {Abdominal Radiology},
year = {2026},
doi = {10.1007/s00261-026-05607-w}
}
EUVIMED