EUVIMEDEUVIMED entdecken
Crossref

A Comprehensive Model for Lean Construction Practices for Sustainable Megaproject Delivery

Abdelazim Ibrahim, Tarek Zayed, Zoubeir Lafhaj

Sustainable Development · 2026-02 · 34 (1) · 1429-1462

DOI: 10.1002/sd.70313 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainable Development, online erschienen am 15.10.2025. Verfasst von Abdelazim Ibrahim und 2 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 180 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Megaprojects, characterized by immense scale and complexity, frequently suffer from inefficiencies, cost overruns, and delays. Lean Construction (LC) offers a strategic solution to enhance efficiency and sustainability, yet its adoption lacks empirically validated, context‐specific frameworks, particularly in rapidly developing economies like China. This study bridges this gap by developing and validating a comprehensive model linking lean construction practices (LCPs) to LC adoption (LCA) in megaprojects. Through a mixed‐methods approach, literature review, expert interviews, and a survey of 379 professionals, 35 LCPs were identified and categorized into six constructs. Structural equation modeling (SEM) confirmed that all six LCP categories significantly and positively influence LCA ( p < 0.001). People Involvement and Continuous Improvement emerged as the strongest predictor ( β = 0.241), followed by safety and quality assurance ( β = 0.202), customer focus and waste elimination ( β = 0.195), standardization and process transparency ( β = 0.192), flow and pull systems ( β = 0.130), and planning and scheduling ( β = 0.110). Subsequently, fuzzy synthetic evaluation (FSE) prioritized “Planning and Scheduling” as the highest‐impact practice, followed by “Flow and Pull Systems” and “Customer Focus and Waste Elimination.” This dual‐method validation not only confirms the theoretical model but also provides a practical, prioritized roadmap for policymakers and practitioners. The findings offer actionable strategies to reduce waste, enhance collaboration, and improve sustainability, making a critical contribution to resilient global infrastructure development.

Zitieren

APA

Ibrahim, A., Zayed, T., & Lafhaj, Z. (2026). A Comprehensive Model for Lean Construction Practices for Sustainable Megaproject Delivery. Sustainable Development, 34(1), 1429-1462. https://doi.org/10.1002/sd.70313

Vancouver

Ibrahim A, Zayed T, Lafhaj Z. A Comprehensive Model for Lean Construction Practices for Sustainable Megaproject Delivery. Sustainable Development. 2026;34(1):1429-1462. doi:10.1002/sd.70313

BibTeX
@article{Ibrahim2026,
  author = {Ibrahim, Abdelazim and Zayed, Tarek and Lafhaj, Zoubeir},
  title = {A Comprehensive Model for Lean Construction Practices for Sustainable Megaproject Delivery},
  journal = {Sustainable Development},
  year = {2026},
  volume = {34},
  number = {1},
  pages = {1429--1462},
  doi = {10.1002/sd.70313}
}
Kostenlos starten →