EUVIMEDEUVIMED entdecken
Crossref

Numerical Study on the Fully Mechanized Rapid Construction Method for Subsea Tunnel

Jian Ni, Xin Gao, Yuxue Chen, Hongliang Liu, Hui Cai, Wenfeng Tu

International Journal for Numerical and Analytical Methods in Geomechanics · 2026-08 · 50 (11) · 4402-4422

DOI: 10.1002/nag.70341 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal for Numerical and Analytical Methods in Geomechanics, online erschienen am 09.05.2026. Verfasst von Jian Ni und 5 weiteren Autor:innen. Die Arbeit nennt 24 Literaturangaben. Gefördert von: National Key Research and Development Program of China, Natural Science Foundation of Shandong Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper presents a case study of a super‐long subsea tunnel in Jiaozhou Bay, Qingdao, China. To address key technical challenges in the fully mechanized rapid construction of super‐long subsea tunnels, this study systematically investigates the optimization of excavation methods and support installation distance across different rock grades by integrated numerical simulation and field monitoring. A numerical model was developed to analyze deformation response and stability under classes III, IV, and V surrounding rock conditions using both bench method and full‐face methods, supplemented by multi‐scenario construction step tests. Results indicate that the full‐face method is suitable for class III rock without strict support distance requirements, where lining can be applied based on monitoring data and construction plans; For class IV rock, the full‐face method is recommended in stable sections, while the bench method should be used in fractured zones, with initial support closure limited to ≤70 m and secondary lining to ≤250 m from the excavation face; For class V rock, the bench method is advised, with initial support closure within ≤60 m and secondary lining within ≤240 m from the excavation face. Field monitoring confirmed that surrounding rock deformation remained within design limits, and initial support performed effectively, validating the proposed methods and distance criteria. This study provides theoretical and practical guidance for fully mechanized construction in similar subsea tunnel projects.

Förderung

  • National Key Research and Development Program of China
  • Natural Science Foundation of Shandong Province

Zitieren

APA

Ni, J., Gao, X., Chen, Y., Liu, H., Cai, H., & Tu, W. (2026). Numerical Study on the Fully Mechanized Rapid Construction Method for Subsea Tunnel. International Journal for Numerical and Analytical Methods in Geomechanics, 50(11), 4402-4422. https://doi.org/10.1002/nag.70341

Vancouver

Ni J, Gao X, Chen Y, Liu H, Cai H, Tu W. Numerical Study on the Fully Mechanized Rapid Construction Method for Subsea Tunnel. International Journal for Numerical and Analytical Methods in Geomechanics. 2026;50(11):4402-4422. doi:10.1002/nag.70341

BibTeX
@article{Ni2026,
  author = {Ni, Jian and Gao, Xin and Chen, Yuxue and Liu, Hongliang and Cai, Hui and Tu, Wenfeng},
  title = {Numerical Study on the Fully Mechanized Rapid Construction Method for Subsea Tunnel},
  journal = {International Journal for Numerical and Analytical Methods in Geomechanics},
  year = {2026},
  volume = {50},
  number = {11},
  pages = {4402--4422},
  doi = {10.1002/nag.70341}
}
Kostenlos starten →