Kurz gefasst
Fachartikel in der Zeitschrift Mining Report, 2013. Verfasst von Esther Neye und 2 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 3 Literaturangaben.
Abstract (Originalsprache)
In 2011 Herrenknecht designed a shaft sinking machine suitable for applications in frozen ground or soft to medium hard rock up to 120 Mpa, with variable shaft diameters as well as geometries. The target was to develop a machine that will provide safe working conditions for the personnel and exceed the shaft sinking rates of conventional systems. Two prototypes were manufactured and assembled at the Herrenknecht works in Schwanau during winter/spring 2012. In early summer of 2012, cutting trials were performed with the aim of achieving the maximal possible cutting rate performance. After successful completion of the cutting trials, the machines where shipped to Canada and assembled at the site. In November 2012, the first machine was lowered into the shaft and first cutting cycles where performed before Christmas 2012. Assembly and commissioning of the second machine follows in early 2013.
Zitieren
APA
Neye, E., Burger, W., & Rennkamp, P. (2013). Rapid shaft sinking. Mining Report. https://doi.org/10.1002/mire.201300029
Vancouver
Neye E, Burger W, Rennkamp P. Rapid shaft sinking. Mining Report. 2013. doi:10.1002/mire.201300029
BibTeX
@article{Neye2013,
author = {Neye, Esther and Burger, Werner and Rennkamp, Patrick},
title = {Rapid shaft sinking},
journal = {Mining Report},
year = {2013},
doi = {10.1002/mire.201300029}
}