EUVIMEDEUVIMED entdecken
Crossref

Incorporating Digital Twins In Early Research and Development of Megaprojects To Reduce Cost and Schedule Risk

Christopher Ritter, Mark Rhoades

INSIGHT · 2023-09 · 26 (3) · 57-65

DOI: 10.1002/inst.12457 ↗

Kurz gefasst

Fachartikel in der Zeitschrift INSIGHT, online erschienen am 27.09.2023. Verfasst von Christopher Ritter und 1 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 47 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Early‐stage research and development (ESR&D) plays a vital role in the product development lifecycle, necessitating innovative approaches to address the complex challenges faced during this phase. This article quantifies how the incorporation of digital twin (DT) technology can reduce cost and schedule risk during ESR&D and later lifecycle stages in megaprojects. The Idaho National Laboratory demonstrated the application of DT in the Microreactor AGile Non‐Nuclear Experimental Testbed (MAGNET) operations phase, showcasing the transformative potential of DT in both design and operation. These advances allowed real‐time assessment of construction changes and their impact on project requirements. By focusing on the benefits of digital twinning, this article aims to promote a more positive attitude toward the incorporation of digital twin technologies in the early stages of R&D projects.

Zitieren

APA

Ritter, C., & Rhoades, M. (2023). Incorporating Digital Twins In Early Research and Development of Megaprojects To Reduce Cost and Schedule Risk. INSIGHT, 26(3), 57-65. https://doi.org/10.1002/inst.12457

Vancouver

Ritter C, Rhoades M. Incorporating Digital Twins In Early Research and Development of Megaprojects To Reduce Cost and Schedule Risk. INSIGHT. 2023;26(3):57-65. doi:10.1002/inst.12457

BibTeX
@article{Ritter2023,
  author = {Ritter, Christopher and Rhoades, Mark},
  title = {Incorporating Digital Twins In Early Research and Development of Megaprojects To Reduce Cost and Schedule Risk},
  journal = {INSIGHT},
  year = {2023},
  volume = {26},
  number = {3},
  pages = {57--65},
  doi = {10.1002/inst.12457}
}
Kostenlos starten →