SBT – Tunnelling in challenging conditions: Approach to overcome a huge water inflow
Geomechanics and Tunnelling · 2026-04 · 19 (2) · 172-185
DOI: 10.1002/geot.70088 ↗Kurz gefasst
Fachartikel in der Zeitschrift Geomechanics and Tunnelling, online erschienen am 08.04.2026. Verfasst von Michael Proprenter und 3 weiteren Autor:innen.
Abstract (Originalsprache)
An unexpected huge water inflow in one of the caverns of construction lot SBT1.1 of the Semmering Base Tunnel (SBT) triggered immediate emergency procedures to avoid a complete loss of access. The provision of safe construction conditions required the construction of large settlement basins underground to enable the temporary discharge of the water to the surface via approx. 250 m deep shafts. The final configuration of the underground structures needed to be adapted to meet the encountered conditions. Extensive preparation and injection works were caried out to create sound and safe conditions for the operational phase of the tunnel system. This was only possible by an open minded, solution oriented and common approach of all stakeholders involved in the project.
Zitieren
APA
Proprenter, M., Holzer, R., Hauer, H., & Fellinger, G. (2026). SBT – Tunnelling in challenging conditions: Approach to overcome a huge water inflow. Geomechanics and Tunnelling, 19(2), 172-185. https://doi.org/10.1002/geot.70088
Vancouver
Proprenter M, Holzer R, Hauer H, Fellinger G. SBT – Tunnelling in challenging conditions: Approach to overcome a huge water inflow. Geomechanics and Tunnelling. 2026;19(2):172-185. doi:10.1002/geot.70088
BibTeX
@article{Proprenter2026,
author = {Proprenter, Michael and Holzer, Robert and Hauer, Hannes and Fellinger, Gerald},
title = {SBT – Tunnelling in challenging conditions: Approach to overcome a huge water inflow},
journal = {Geomechanics and Tunnelling},
year = {2026},
volume = {19},
number = {2},
pages = {172--185},
doi = {10.1002/geot.70088}
}
EUVIMED