SBT – Slope cuts: Planning requirements for different planning phases
Geomechanics and Tunnelling · 2026-04 · 19 (2) · 315-330
DOI: 10.1002/geot.70078 ↗Kurz gefasst
Fachartikel in der Zeitschrift Geomechanics and Tunnelling, online erschienen am 06.04.2026. Verfasst von Johannes Weigl und 2 weiteren Autor:innen.
Abstract (Originalsprache)
The Semmering Base Tunnel was constructed from several intermediate access points, which required the establishment of the necessary construction sites. At these sites, slope cuts with related support measures had to be carried out. This article describes the approach taken in planning the support measures for two of these slope cuts, as well as the adjustments that became necessary during the different planning phases as the project progressed.
Zitieren
APA
Weigl, J., Holzer, R., & Vanek, R. (2026). SBT – Slope cuts: Planning requirements for different planning phases. Geomechanics and Tunnelling, 19(2), 315-330. https://doi.org/10.1002/geot.70078
Vancouver
Weigl J, Holzer R, Vanek R. SBT – Slope cuts: Planning requirements for different planning phases. Geomechanics and Tunnelling. 2026;19(2):315-330. doi:10.1002/geot.70078
BibTeX
@article{Weigl2026,
author = {Weigl, Johannes and Holzer, Robert and Vanek, Robert},
title = {SBT – Slope cuts: Planning requirements for different planning phases},
journal = {Geomechanics and Tunnelling},
year = {2026},
volume = {19},
number = {2},
pages = {315--330},
doi = {10.1002/geot.70078}
}
EUVIMED