EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Waste activated sludge high‐rate treatment of septage: Stabilization phase trials and comparison with winery wastewater treatment

Arman Shirali, Melody Blythe Johnson, Mehrab Mehrvar

The Canadian Journal of Chemical Engineering · 23.06.2026

DOI: 10.1002/cjce.70476 ↗

Kurz gefasst

Fachartikel in der Zeitschrift The Canadian Journal of Chemical Engineering, online erschienen am 23.06.2026. Verfasst von Arman Shirali und 2 weiteren Autor:innen. Die Arbeit nennt 52 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0). Gefördert von: Natural Sciences and Engineering Research Council of Canada, Toronto Metropolitan University.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The waste‐activated sludge high‐rate (WASHR) process is evaluated as a batch‐mode pre‐treatment for actual septage using a high‐rate contact stabilization (HRCS) approach. Designed to reduce organic loadings on downstream processes, the WASHR process features a relatively short aerobic contact phase (1–6 h) that promotes the adsorption of organics onto the activated sludge biomass followed by settling and decanting, and a longer stabilization phase (8–56 h) that provides aerobic stabilization of the settled biomass. This study investigated the stabilization phase performance at a contact phase loading rate of 2.0 mg COD/mg MLVSS, focusing on maximizing chemical oxygen demand (COD) removal, volatile solids (VS) removal, and observed biomass yield. Two sets of trials using different septage samples were conducted, with hydraulic retention time (HRT) and operating temperature as independent variables. For the first trial set, a contact phase COD removal of 83.1% was observed after 5 h. During the subsequent stabilization phase, maximum COD and VS removals of 36.8% and 20.1%, respectively, were observed at an HRT of 56 h, while the highest observed biomass yield of 0.205 mg VSS/mg COD removed occurred at 24 h. In the second trial, peak COD and VS removals were 34.8% and 16.5%, respectively, at 52 h, with a maximum observed biomass yield of 0.257 mg VSS/mg COD removed at 28 h. These results are compared to those from a previous WASHR study regarding the treatment of winery wastewater, with the aim of highlighting the potential in HRCS processes for enhancing organics oxidation in high‐strength wastewater treatment, rather than maximizing energy recovery.

Förderung

  • Natural Sciences and Engineering Research Council of Canada
  • Toronto Metropolitan University

Zitieren

APA

Shirali, A., Johnson, M. B., & Mehrvar, M. (2026). Waste activated sludge high‐rate treatment of septage: Stabilization phase trials and comparison with winery wastewater treatment. The Canadian Journal of Chemical Engineering. https://doi.org/10.1002/cjce.70476

Vancouver

Shirali A, Johnson MB, Mehrvar M. Waste activated sludge high‐rate treatment of septage: Stabilization phase trials and comparison with winery wastewater treatment. The Canadian Journal of Chemical Engineering. 2026. doi:10.1002/cjce.70476

BibTeX
@article{Shirali2026,
  author = {Shirali, Arman and Johnson, Melody Blythe and Mehrvar, Mehrab},
  title = {Waste activated sludge high‐rate treatment of septage: Stabilization phase trials and comparison with winery wastewater treatment},
  journal = {The Canadian Journal of Chemical Engineering},
  year = {2026},
  doi = {10.1002/cjce.70476}
}
Kostenlos starten →