Reuse of strands of the cable stayed Normandie bridge
ce/papers · 2026-09 · 9 (2-3) · 198-202
DOI: 10.1002/cepa.70407 ↗Kurz gefasst
Fachartikel in der Zeitschrift ce/papers, online erschienen am 14.09.2026. Verfasst von André Beyer und 2 weiteren Autor:innen. Die Arbeit nennt 14 Literaturangaben.
Abstract (Originalsprache)
In the context of replacing the stay cables of the Normandie Bridge, opened to the public in 1995, an opportunity emerged to investigate the potential reuse of strands recovered from the cables to be replaced. A second life for these strands was identified when the Centre des Monuments Nationaux expressed the need for rehabilitation of Saint Nicolas Tower in La Rochelle (France). Due to challenging geotechnical conditions, this tower had begun to exhibit lateral deformation, creating the necessity for a temporary externally applied posttensioning system to stabilize the structure during retrofitting works. This paper presents the evaluation process carried out to determine the suitability of the reclaimed strands for this specific application. Following an initial condition assessment, which yielded encouraging results, a series of requalification tests was performed. The paper details these investigations and discusses the outcomes in the context of structural reuse and temporary reinforcement strategies.
Zitieren
APA
Beyer, A., Louedec, L. L., & Fabry, N. (2026). Reuse of strands of the cable stayed Normandie bridge. ce/papers, 9(2-3), 198-202. https://doi.org/10.1002/cepa.70407
Vancouver
Beyer A, Louedec LL, Fabry N. Reuse of strands of the cable stayed Normandie bridge. ce/papers. 2026;9(2-3):198-202. doi:10.1002/cepa.70407
BibTeX
@article{Beyer2026,
author = {Beyer, André and Louedec, Ludovic Le and Fabry, Nicolas},
title = {Reuse of strands of the cable stayed Normandie bridge},
journal = {ce/papers},
year = {2026},
volume = {9},
number = {2-3},
pages = {198--202},
doi = {10.1002/cepa.70407}
}
EUVIMED