Stade Moulay Abdellah Steel Roof: A Case Study in Structural Design for Fast‐Track Construction
ce/papers · 2026-04 · 9 (1) · 251-261
DOI: 10.1002/cepa.70276 ↗Kurz gefasst
Fachartikel in der Zeitschrift ce/papers, online erschienen am 28.04.2026. Verfasst von Nuno Telmo Lopes und 1 weiteren Autor:innen.
Abstract (Originalsprache)
This article presents the main aspects of the structural design of the steel roof structure of the new Prince Moulay Abdellah football stadium. Located in Rabat, the capital of Morocco, this project is part of a sports complex that also includes an athletics stadium, an indoor arena, and an Olympic swimming pool. The project involves reconstruction of the former Prince Moulay Abdellah Stadium on the same site, after demolition of the existing stadium. Construction was completed in August 2025. The stadium was used during the 2025 Africa Cup of Nations and has been confirmed for the 2030 FIFA World Cup.
Zitieren
APA
Lopes, N. T., & Alves, R. F. (2026). Stade Moulay Abdellah Steel Roof: A Case Study in Structural Design for Fast‐Track Construction. ce/papers, 9(1), 251-261. https://doi.org/10.1002/cepa.70276
Vancouver
Lopes NT, Alves RF. Stade Moulay Abdellah Steel Roof: A Case Study in Structural Design for Fast‐Track Construction. ce/papers. 2026;9(1):251-261. doi:10.1002/cepa.70276
BibTeX
@article{Lopes2026,
author = {Lopes, Nuno Telmo and Alves, Rui Ferreira},
title = {Stade Moulay Abdellah Steel Roof: A Case Study in Structural Design for Fast‐Track Construction},
journal = {ce/papers},
year = {2026},
volume = {9},
number = {1},
pages = {251--261},
doi = {10.1002/cepa.70276}
}
EUVIMED